Uploaded image for project: 'jBPM'
  1. jBPM
  2. JBPM-7056

It should be possible to connect Top Level Process Node with Start Event inside of Subprocess

    XMLWordPrintable

Details

    • Enhancement
    • Resolution: Unresolved
    • Minor
    • None
    • 7.6.0.Final
    • Runtime Engine
    • NEW
    • NEW

    Description

      According to specification:

      A Start Event MUST NOT be a target for Sequence Flows; it MUST NOT have incoming Sequence Flows.
      An exception to this is when a Start Event is used in an Expanded Sub-Process and is attached to the boundary of that Sub-Process. In this case, a Sequence Flow from the higher-level Process MAY connect to that Start Event in lieu of connecting to the actual boundary of the Sub-Process.

      but it is not possible in current Engine implementation.

      For more details see BPMN 2.0 Specification page 245.

      Update: The same is valid for End Events, you should be able to connect subprocess' End Event with next node.

      Attachments

        Activity

          People

            swiderski.maciej Maciej Swiderski (Inactive)
            kgaevski@redhat.com Kirill Gaevskii
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated: