Uploaded image for project: 'JBoss Enterprise Application Platform 4 and 5'
  1. JBoss Enterprise Application Platform 4 and 5
  2. JBPAPP-2238

org.jboss.test.jca.test.BaseConnectionManagerStressTestCase fails to get managed connection

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Won't Do
    • Icon: Major Major
    • EAP 5.0.0.CR1
    • EAP 5.0.0.BETA
    • JCA
    • None
    • Solaris 9, x86

    • Low

      All of the 13 tests in org.jboss.test.jca.test.BaseConnectionManagerStressTestCase are failing with the same error.
      Here is an example from the test shortBlockingFill:

      <testcase classname="org.jboss.test.jca.test.BaseConnectionManagerStressTestCase" name="testShortBlockingNoFill" time="1.601">
      <failure message="Blocking Timeout occurred in ShortBlocking test: javax.resource.ResourceException: Unable to get managed connection for null" type="junit.framework.AssertionFailedError">junit.framework.AssertionFailedError: Blocking Timeout occurred in ShortBlocking test: javax.resource.ResourceException: Unable to get managed connection for null
      at org.jboss.test.jca.test.BaseConnectionManagerStressTestCase.doShortBlocking(BaseConnectionManagerStressTestCase.java:266)
      at org.jboss.test.jca.test.BaseConnectionManagerStressTestCase.testShortBlockingNoFill(BaseConnectionManagerStressTestCase.java:105)
      </failure>

      The client side output log for this test case as client-output.log.
      The server side output log is attached as server-output.log

      This error is repeatable. Wasn't able to get any further information by running one-test.

              jpederse@redhat.com Jesper Pedersen
              rachmato@redhat.com Richard Achmatowicz
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Created:
                Updated:
                Resolved: