This arose in an e-mail from Nick:
"Should we be splitting the cont's and test builds apart so they don't include the SOA components in the Core builds?
Realize that I split up the aggregate + JBDS update site builds, but not the all-in-one tests job or the "does everything compile?" jobs."
I think the answer is "yes" we need to do these things. The upside is that it should speed up the component builds on both sides of the equation. The downside is that it means more work for Nick and/or Doug.
- blocks
-
JBIDE-8656 Split SOA components out of JBoss Tools aggregate site; create 2nd aggregate for SOA Tooling
- Closed
- is blocked by
-
JBIDE-9469 test failures in org.jboss.tools.jbpm.ui.bot.test
- Resolved
-
JBIDE-9460 test failures in org.jboss.tools.smooks.ui.bot.test
- Resolved
-
JBIDE-8734 Update Site containing JBT Bot Tests
- Closed
-
JBIDE-9582 2 test failures in org.jboss.tools.esb.validator.test.ESBValidatorAllTests (failing for 19 builds)
- Closed