Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-8866

Move all plugins up to baseline

XMLWordPrintable

    • Icon: Task Task
    • Resolution: Done
    • Icon: Major Major
    • 4.6.0.Final
    • 3.3.0.M2
    • build
    • None

      Not really sure who to assign this to, short of making three dozen separate jira issues I have 33 patches, one for each module, which modify all manifest.mf version numbers (in plugins, not in tests) to be brought up to our current baseline.

      So assuming our baseline for some specific plugin is 3.6.200, these patches will turn a dependency on this.specific.runtime into this.specific.runtime;bundle-version="3.6.200". If a plugin currently reads this.specific.plugin;bundle-version="3.5.0", it will move it up to this.specific.runtime;bundle-version="3.6.200".

      Etc.

              rob.stryker Rob Stryker (Inactive)
              rob.stryker Rob Stryker (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated:
                Resolved: