Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-4608

Hot deployment woks incorrectly with JBossAS Tools

    XMLWordPrintable

Details

    • Bug
    • Resolution: Won't Do
    • Major
    • None
    • 3.0.1.GA
    • server

    Description

      Hot deployment does not work as expected with the above configuration.

      • Two eclipse projects are created: one EJB Project containing single EJB, and one EAR project containing that EJB.
      • EAR Project is deployed to JBoss thru JBoss Server View.
      • JBoss started and recognized EJB:
        clear-ear/EJB01/remote - EJB3.x Default Remote Business Interface
        clear-ear/EJB01/remote-EJBRem - EJB3.x Remote Business Interface
      • When source code of EJB is changed, it is recompiled and "Republish" note appeared
      • After pressing "Full publish" code is actually copied to the deploy folder on the server (byte code is verified manually), but JBoss does not detect hot deployment and does not redeploy EJB

      When trying to make deployment thru Project Archives View on the same configuration, the following happening:

      • Archives are created within eclipse project folder.
      • After pressing "Publish to Server" in Project Archives View, item appears in JBoss Server View, but archive is not copied into JBoss deploy folder and JBoss does not detect that new EJB is deployed.

      JBoss' properties are:
      Use the JBoss deploy folder

      Tested on two separate machines. Results are the same.

      Attachments

        Issue Links

          Activity

            People

              rob.stryker Rob Stryker (Inactive)
              sanches_jira Alexander Lengson (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 3 days
                  3d
                  Remaining:
                  Remaining Estimate - 3 days
                  3d
                  Logged:
                  Time Spent - Not Specified
                  Not Specified