Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-28779

Telemetry consent is not respected when starting CRC together with setting CRC up

    XMLWordPrintable

Details

    • Bug
    • Resolution: Done
    • Major
    • 4.26.0.Final
    • 4.26.0.AM1
    • openshift
    • None
    • Sprint #228 Dec 2022
    • 3
    • ---

    Description

      Description of problem:

      Telemetry consent for CRC is not respected. I guess that api changed. User is asked again in Eclipse terminal to provide a consent.

      Prerequisites (if any, like setup, operators/versions):

      CRC 2.10.2, eclipse 2022-12 M2 + JBT 4.26.0.AM1

      Steps to Reproduce

      1. Create New CRC server
      2. Remove ~/.crc
      3. Start CRC
      4. Dialog asking about CRC setup and telemetry consent checkbox is opened
      5. Uncheck the telemetry acceptance, let the CRC to be setted up.

      Actual results:

      User is again asked about telemetry consent in terminal

      Expected results:

      User resolution is accepted and propagated into CRC correctly.

      Reproducibility (Always/Intermittent/Only Once):

      Build Details:

      Additional info (Such as Logs, Screenshots, etc):

      Attachments

        Activity

          People

            jmaury@redhat.com Jeff MAURY
            odockal@redhat.com Ondrej Dockal
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: