Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-23019

Integration tests (OpenShift): have them running automatically, continuously

    Details

    • Sprint:
      devex #123 November 2016, devex #128 February 2017, devex #130 April 2017, devex #139 October 2017
    • Story Points:
      20

      Description

      The integration tests suite is very lenghty to run and should thus be run in a continuous manner on our CI.
      There are several pain-points currently:

      • there's no dedicated OS instance to run them against
      • tests are not stable
      • etc.

        Gliffy Diagrams

          Attachments

            Issue Links

              Activity

                People

                • Assignee:
                  jkopriva Josef Kopriva
                  Reporter:
                  adietish André Dietisheim
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  4 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved: