While installing everything from Central, the following occurred resolving deps for com.atlassian.connector.eclipse 3.2.2 to javax.activation [1.1.0.v201108011116]:
13:20:41 [p2.dir] Cannot complete the install because one or more required items could not be found. 13:20:41 [p2.dir] Software being installed: Atlassian Connector for Eclipse 3.2.2.v20130909 (com.atlassian.connector.eclipse.feature.group 3.2.2.v20130909) 13:20:41 [p2.dir] Missing requirement: Atlassian JIRA Connector (Recommended) 3.2.2.v20130909 (com.atlassian.connector.eclipse.jira.feature.group 3.2.2.v20130909) requires 'javax.activation [1.1.0.v201108011116]' but it could not be found 13:20:41 [p2.dir] Cannot satisfy dependency: 13:20:41 [p2.dir] From: Atlassian Connector for Eclipse 3.2.2.v20130909 (com.atlassian.connector.eclipse.feature.group 3.2.2.v20130909) 13:20:41 [p2.dir] To: com.atlassian.connector.eclipse.jira.feature.group [3.2.2.v20130909] 13:20:41 [p2.dir] Application failed, log file location: /mnt/hudson_workspace/workspace/jbosstools-install-p2director.install-tests.matrix_master/6661f455/eclipse/configuration/1433179218565.log 13:20:41 [p2.dir] Installation failed.