-
Feature Request
-
Resolution: Done
-
Critical
-
2.0.0.CR1
-
None
Jmx DeploymentScanner has suspendDeployment() and resumeDeployment() which could be usefull to call before/after deployment.
See: http://docs.jboss.org/jbossas/javadoc/4.0.4/system/org/jboss/deployment/scanner/URLDeploymentScanner.html
addURL() could be used to have our own eclipse workspace local deployment which won't pollute existing configurations.
- is related to
-
JBIDE-1407 "(Add and) Remove Projects" produces an error
- Closed
-
JBIDE-1375 Deploy of Seam War right away after creating project doesn't work. http 404 error
- Closed
-
JBDS-304 Incremental deployment, JBoss 5
- Closed
- relates to
-
JBIDE-828 Problem with an exploded archive
- Closed