Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-11928

Status is not correct after deploying the BPEL project

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Unresolved
    • Icon: Critical Critical
    • 4.0.0.Alpha1-SOA
    • 3.3.0.CR1-SOA
    • bpel
    • None
    • Eclipse 3.7.2 + org.jboss.tools.bpel.feature 1.1.0.v20120520-1959-H767-CR1 + org.jboss.ide.eclipse.as.feature 2.3.0.v20120521-2038-H1325-CR1

    • Documentation (Ref Guide, User Guide, etc.), Release Notes
    • Hide

      By doing 'Full Publish' the status will change to '[Started, Synchronized]'

      Show
      By doing 'Full Publish' the status will change to ' [Started, Synchronized] '

      1. Start the server
      2. Deploy the BPEL project
      3. The status has changed to '[Started, Republish]' instead of '[Started, Synchronized]'

      See also:
      https://issues.jboss.org/browse/JBIDE-9789
      https://issues.jboss.org/browse/JBIDE-11608

              bbrodt_jira Robert (Bob) Brodt (Inactive)
              apodhrad@redhat.com Andrej Podhradsky
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated: