Component Upgrade
-
Resolution: Done
-
Major
-
None
-
False
-
-
False
-
-
-
-
-
The jboss-eap8 branch needs to be updated to use the JBEAP-29579 fix that is in wildfly-core-eap 27.1.0.Final-redhat-00001.
This isn't just a manifest update; a change to the pom is needed so the JBEAP-27226 fix that requires the core update can be tested.
- depends on
-
JBEAP-29892 (8.1.z) Upgrade WildFly Core from 27.0.1.Final-redhat-00006 to 27.1.0.Final-redhat-00001
-
- Verified
-
- is incorporated by
-
JBEAP-30002 Upgrade JBoss EAP 8.1 to 34e78efebeb9415684b1641b841216b00b1d8d4f
-
- Verified
-
- is related to
-
JBEAP-30637 List of JIRA resolved in this release of EAP 8.1.0
-
- Closed
-