Uploaded image for project: 'Application Server 3  4  5 and 6'
  1. Application Server 3 4 5 and 6
  2. JBAS-7500 Synch 6.0.0.M1 changes with trunk
  3. JBAS-7516

Remove -e and -h command line args from org.jboss.Shutdown

XMLWordPrintable

    • Icon: Sub-task Sub-task
    • Resolution: Done
    • Icon: Minor Minor
    • 6.0.0.M2
    • None
    • None
    • None

      The code that actually did anything with these was removed in r91254 for JBAS-6856, but the parsing logic is still there; should be removed as it's not there in 6.0.0.M1.

              arubinge@redhat.com Andrew Rubinger (Inactive)
              bstansbe@redhat.com Brian Stansberry
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: