-
Sub-task
-
Resolution: Done
-
Major
-
None
-
None
We are currently at a jboss-integration 5.0.0.Beta.
Upgrade jboss-integration to 5.0.0.CR2, because the CR1 release made at some point was in error. Although it was removed by the repository and the tag was deleted it could have been cached by some local maven repo.
So produce a 5.0.0.CR2 version instead.
- blocks
-
JBAS-5685 XAResourceWrapper should be in the transaction SPI
- Closed