-
Task
-
Resolution: Done
-
Critical
-
4.2.0.Final
-
None
-
None
-
High
FLUSH is needed to control messages not being sent when a new view is installed, as we have observed that without this, messages get dropped by the joiner. We need to find a better way to deal with this as FLUSH is expensive and not very scalable.
- is related to
-
ISPN-937 FLUSH removal causing state transfer timeouts
- Closed