Uploaded image for project: 'OpenShift Hosted Control Plane'
  1. OpenShift Hosted Control Plane
  2. HOSTEDCP-863

Phase 3: Process design completed and implementation begins to improve tracked service metrics (4 DORA metrics & Signal to Noise Ratio).

XMLWordPrintable

    • 0
    • 0
    • 0

      Via the services dashboard the following should be tracked:
      SLO & DORA metrics

      Additionally the team should be watching their Signal to Noise Ratio:

      Where needed improvements should have been scoped. These improvement should be prioritized in the backlog as fairly high and work should be in progress to improve what needed improving.

      For SLO Improvements: SLO Best Practices

              Unassigned Unassigned
              mmazur@redhat.com Mariusz Mazur
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: