Uploaded image for project: 'Insights Experiences'
  1. Insights Experiences
  2. HMS-3735

Error message mismatch when running a conversion task while the preconversion is still running

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Minor Minor
    • Conversions-Phase 3
    • Conversions-Phase 3
    • Conversions
    • None
    • Low
    • None

      There is a mismatch when running a conversion task in a host while the preconversion is still running. After the conversion task fails the error message refers at the task as pre-conversion, I attach an image.

      Doing the opposite, running a preconversion while a conversion is going, displays the same error but in that case is correct.

       

      How to reproduce the bug:

      1. Connect a CentOS 7.9 to stage Insights.
      2. Run the pre-analysis task in the host.
      3. Before the pre-analysis task ends, run the conversion task in the same host.
      4. The conversion task fails displaying the wrong error message.

              rolivier@redhat.com Rodolfo Olivieri
              rh-ee-ssantama Sergio Santamaria Riocerezo
              Sergio Santamaria Riocerezo Sergio Santamaria Riocerezo
              None
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: