Uploaded image for project: 'OpenShift GitOps'
  1. OpenShift GitOps
  2. GITOPS-7959

Argo CD Agent: Allow sync operations to be terminated from the control plane

XMLWordPrintable

    • 13
    • False
    • Hide

      None

      Show
      None
    • False
    • GitOps Scarlet Sprint 23

      Story (Required)

      See https://github.com/argoproj-labs/argocd-agent/issues/565

      Acceptance Criteria (Mandatory)

      • Sync operations can be terminated from control plane
      • Unit/E2E tests to verify this works as expected

      Definition of Done

      • Code Complete:
        • All code has been written, reviewed, and approved.
      • Tested:
        • Unit tests have been written and passed.
        • Ensure code coverage is not reduced with the changes.
        • Integration tests have been automated.
        • System tests have been conducted, and all critical bugs have been fixed.
        • Tested and merged on OpenShift either upstream or downstream on a local build.
      • Documentation:
        • User documentation or release notes have been written (if applicable).
      • Build:
        • Code has been successfully built and integrated into the main repository / project.
        • Midstream changes (if applicable) are done, reviewed, approved and merged.
      • Review:
        • Code has been peer-reviewed and meets coding standards.
        • All acceptance criteria defined in the user story have been met.
        • Tested by reviewer on OpenShift.
      • Deployment:
        • The feature has been deployed on OpenShift cluster for testing.

              cbanavik Chetan Banavikalmutt
              jgwest Jonathan West
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: