Uploaded image for project: 'OpenShift GitOps'
  1. OpenShift GitOps
  2. GITOPS-7698

Update the PLM Product Ops page

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Done
    • Icon: Undefined Undefined
    • 1.17.0
    • None
    • None
    • None

      Story (Required)

      As a release engineer, releasing OpenShift GitOps 1.17.0, I want the the PLM Product Ops page be updated with the EOL dates and maintenance details so that customers are made aware of the lifecycle dates of OpenShift GitOps.

      Create a JIRA ticket under PLM Product Ops

      Out of scope

      NA

      Approach (Required)

      1. Create a JIRA ticket under PLM Product Ops with the title "Update OpenShift GitOps lifecycle page for 1.17.0"
      2. Provide the following details

      • Release Date
      • Supported OCP versions (eg. 4.12-4.19)
      • Full support end date (eg: for 1.17.0, it is with release of 1.18.0 N+1)
      • Maintenance support date ( eg. for 1.17.0, it is with release of 1.20.0 N+3
        3. Assign the tickets to rhn-support-edrich
        4. Example tickets
        PLMCORE-12621
        PLMCORE-12277

      Dependencies

      The release should have been completed and the errata should be in SHIPPED_LIVE state.

      Acceptance Criteria (Mandatory)

      The product ops page is updated with the right information
      https://access.redhat.com/product-life-cycles
      https://access.redhat.com/product-life-cycles?product=Red%20Hat%20OpenShift%20GitOps

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

              oksenzov@redhat.com Olga Ksenzova
              rh-ee-anjoseph Anand Francis Joseph
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: