Story (Required)
- Create a presentation for the 2025 Virtual Intern expo.
- 5 sliders and presentation is 5 minutes.
Background and Approach
- Slides needed
- Title slide
- Introduction slide
- Slides on projects
- Thank you slide
Out of Scope
- <Defines what is not included in this story.>
Dependencies
- <Describes what this story depends on. Dependent stories and EPICs should be linked to the story.>
Acceptance Criteria (Mandatory)
- <Describe edge cases to consider when implementing the story and defining tests.>
- <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story.>
Definition of Done
- Code Complete:
- All code has been written, reviewed, and approved.
- Tested:
- Unit tests have been written and passed.
- Ensure code coverage is not reduced with the changes.
- Integration tests have been automated.
- System tests have been conducted, and all critical bugs have been fixed.
- Tested and merged on OpenShift either upstream or downstream on a local build.
- Documentation:
- User documentation or release notes have been written (if applicable).
- Build:
- Code has been successfully built and integrated into the main repository / project.
- Midstream changes (if applicable) are done, reviewed, approved and merged.
- Review:
- Code has been peer-reviewed and meets coding standards.
- All acceptance criteria defined in the user story have been met.
- Tested by reviewer on OpenShift.
- Deployment:
- The feature has been deployed on OpenShift cluster for testing.