-
Story
-
Resolution: Done
-
Undefined
-
None
-
None
-
GitOps Tangerine Sprint 16
Story (Required)
- Will improve the script to use an annotated tag with a message instead of the current light-weight tag.
- Will improve to push the changed VERSION file in addition to the new tag to the remote.
- Will add sample usages as comments and improve help messages to add for a smoother experience.
Background and Approach (Required)
- Will read through the script to get an understanding of its purpose and how it works then apply the improvements to it.
Out of Scope
- <Defines what is not included in this story.>
Dependencies
- <Describes what this story depends on. Dependent stories and EPICs should be linked to the story.>
Acceptance Criteria (Mandatory)
- <Describe edge cases to consider when implementing the story and defining tests.>
- <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story.>
Definition of Done
- Code Complete:
- All code has been written, reviewed, and approved.
- Tested:
- Unit tests have been written and passed.
- Ensure code coverage is not reduced with the changes.
- Integration tests have been automated.
- System tests have been conducted, and all critical bugs have been fixed.
- Tested and merged on OpenShift either upstream or downstream on a local build.
- Documentation:
- User documentation or release notes have been written (if applicable).
- Build:
- Code has been successfully built and integrated into the main repository / project.
- Midstream changes (if applicable) are done, reviewed, approved and merged.
- Review:
- Code has been peer-reviewed and meets coding standards.
- All acceptance criteria defined in the user story have been met.
- Tested by reviewer on OpenShift.
- Deployment:
- The feature has been deployed on OpenShift cluster for testing.