Story
-
Resolution: Done
-
Undefined
-
None
-
8
-
False
-
-
False
-
-
-
GitOps Tangerine Sprint 12, GitOps Tangerine Sprint 13
Story (Required)
- See upstream enhancement https://github.com/argoproj/argo-cd/issues/21647
- This Jira covers only the UI changes because Anand S. has already took ownership of the non-UI changes.
Background and Approach (Required)
- Anand S. first will create the PR for necessary changes to the sync policy/app controller/etc. areas, and will be done in a separate Jira
- UI changes to allow the new field to be added or removed and can be done as a follow-up PR
Out of Scope
- N/A
Dependencies
- Anand's PR
Acceptance Criteria (Mandatory)
- Tests completed
Definition of Done
- Code Complete:
- All code has been written, reviewed, and approved.
- Tested:
- Unit tests have been written and passed.
- Ensure code coverage is not reduced with the changes.
- Integration tests have been automated.
- System tests have been conducted, and all critical bugs have been fixed.
- Tested and merged on OpenShift either upstream or downstream on a local build.
- Documentation:
- User documentation or release notes have been written (if applicable).
- Build:
- Code has been successfully built and integrated into the main repository / project.
- Midstream changes (if applicable) are done, reviewed, approved and merged.
- Review:
- Code has been peer-reviewed and meets coding standards.
- All acceptance criteria defined in the user story have been met.
- Tested by reviewer on OpenShift.
- Deployment:
- The feature has been deployed on OpenShift cluster for testing.