Uploaded image for project: 'OpenShift GitOps'
  1. OpenShift GitOps
  2. GITOPS-4430

v1.10.4: Errata validations

XMLWordPrintable

    • Icon: Task Task
    • Resolution: Done
    • Icon: Major Major
    • None
    • None
    • None
    • None

      Errata: https://errata.engineering.redhat.com/advisory/129681 

      Moving Erratas to QE State checklist:

      Before testing:

      • Errata advisory state has been moved to QE
      • Right builds have been attached to the errata
      • Release date is updated
      • If releasing RPM,
        • TPS tests are enabled for KAM (Check the TPS tab in RPM advisory)
        • All the supported architectures are listed for RPMs (Check the TPS tab in RPM advisory

      RC: 

      • All the component versions have been delivered according to the component matrix
      • CRDs are updated
      • All the planned features/bug fixes delivered

       

      Advisory (After testing, before the release):

      • Greenwave CVP Tests - Operator Builds is successful (External test from Pipeline)
      • Approval: Docs and InfoSec (if applicable) 
      • If releasing RPM, TPS tests have been executed successfully
      • Push to CDN Staging is complete
      • Push to CDN Docker Staging is complete
      • Move the state from QE to REL_PREP

              rhn-support-vab Varsha B
              rhn-support-vab Varsha B
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: