Uploaded image for project: 'OpenShift GitOps'
  1. OpenShift GitOps
  2. GITOPS-3147

Update acceptance-tests-release pipeline to run stable kuttl tests

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Done
    • Icon: Major Major
    • None
    • None
    • Exp: Outer-Loop
    • None
    • 5
    • False
    • None
    • True
    • RHDP-675 - Enable continuous delivery of gitops product and enhancements
    • GITOPS Sprint 243, GITOPS Sprint 3244

      Background:

      As send-resultsdb-notification task and gating are confirmed working, it's time to remove the temporary cvp-acceptance-test from the acceptance-tests-release pipeline. There are still flaky kuttl tests, which needed to be ignored in the operator-e2e repo so that it won't cause pipeline run failure.

      Approach (Required)

      • Remove cvp-acceptance-test from acceptance-tests-release
      • Send cvp tests results based of kuttl tests result and kam tests result
      • Put all flaky kuttl tests in operator-e2e/gitops-operator/tests to aside and make sure the rest tests all pass.
      • After making sure kuttl tests pass on pipeline run, remove temporary operator-e2e/gitops-operator/tests/acceptance tests from operator-e2e repo.

      Acceptance Criteria (Mandatory)

      1. send-resultsdb-notification task runs successfully on acceptance-tests-release pipeline run with no cvp-acceptance-test task.
      2. Tests results get sent to resultsDB after acceptance-tests-release pipeline run. Make sure it always send "passed" as flaky tests will be ignored in this tickets.

      Done Checklist

      • Test code is completed, reviewed, documented, and checked in.
      • Tests are passing in a healthy GitOps operator installation.
      • Acceptance criteria are met.

              yicai@redhat.com Yi Cai
              yicai@redhat.com Yi Cai
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Estimated:
                  Original Estimate - 3 minutes
                  3m
                  Remaining:
                  Remaining Estimate - 3 minutes
                  3m
                  Logged:
                  Time Spent - Not Specified
                  Not Specified