Epic Goal
- Track the test execution effort for the 1.8.4 release test plan
Why is this important?
- Will provide evidence of test coverage and measure total effort
Scenarios
- https://docs.google.com/spreadsheets/d/1gGrEAb---PXpjsb_0Y9X6baWoA2RiqOqEBPanep1KDo/edit?usp=sharing
Acceptance Criteria
- Stories for each permutation to be covered will be created and linked to this story.
- Each story has sizing points
- Each story will be linked to this epic
Done Checklist
Any Gaps will be listed in
- Al stories are set to done.
- Any gaps will be listed in the "Details and Support matrix" tab
Epic Goal
- To test GitOps 1.8.4 before releasing it to the market.
Why is this important?
- We need to validate the release to ensure the quality of the shipped software.
Scenarios
- OCP regular on AWS/GCP/PSI.
Acceptance Criteria (Mandatory)
- The release candidate for 1.8.4 has been properly validated.
- QE team agrees to the release and is confident about that.
Done Checklist
- Acceptance criteria are met
- Non-functional properties of the Feature have been validated (such as performance, resource, UX, security or privacy aspects)
- clones
-
GITOPS-3016 GitOps 1.9.1 Release Test Execution
- Closed
- is cloned by
-
GITOPS-3165 GitOps 1.7.5 Release Test Execution
- Closed
-
GITOPS-3252 GitOps 1.8.5 Release Test Execution
- Closed