Uploaded image for project: 'AMQ Broker'
  1. AMQ Broker
  2. ENTMQBR-8112

Drainer pod reports success despite failing to resolve the broker URL & failure to migrate

    XMLWordPrintable

Details

    • Bug
    • Resolution: Done
    • Undefined
    • None
    • None
    • container image, operator
    • None

    Description

      I've reproduce it by this steps:

      1. Spawn 2 instances of broker
      2. Sent 100 non-durable messages + 100 durable messages to Broker#2
      3. Scaledown

      At this point, Drain pod has been spawned which has produced the attached log. As it can be seen in the log, the Drainer has failed to actually connect to Broker #1, however it has reported a success & has removed the PVC/PV (so durable messages are gone).

      Attachments

        Issue Links

          Activity

            People

              dbruscin Domenico Francesco Bruscino
              mkrutov Mikhail Krutov
              Mikhail Krutov Mikhail Krutov
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: