-
Story
-
Resolution: Obsolete
-
Major
-
None
-
AMQ 7.5.0.GA
-
None
When debugging message migraiton on openshift, Drainer pods are decomissioned immediatelly after process has finished.
This means that logs on the pods are removed as soon as they finish processing.
Drainer broker should be able to pause itself for configurable time to get logs from pods, which should be configurable through a special environmental variable, or flag, or xml configuration option.
- is incorporated by
-
ENTMQBR-6414 Drainer task should be run as a job and not as unmanaged pod
- To Do
- is related to
-
ENTMQBR-3575 Operator shouldn't remove Drainer pods right after them finishing
- Backlog
-
ENTMQBR-6414 Drainer task should be run as a job and not as unmanaged pod
- To Do
-
ENTMQBR-8610 [Docs] Drainer task should be run as a job and not as unmanaged pod
- Closed