-
Task
-
Resolution: Duplicate
-
Critical
-
None
-
AMQ 7.2.0.GA
-
None
There are instabilities in ActiveMQ Artemis upstream test suite. CI job [1] runs the upstream test suite on RHEL 6/7 and JDK matrix every two days. In some runs there are more than 100 failed tests.
Many of the failures are caused by test issues or by race condition and it is hard to reproduce them. Investigation and fixing take a lot of time.
Because of these failures it is very hard to determine if a new commit or a release brings some regression or not.
EAP QE has already done a lot of test fixes [2] but engineering cooperation is needed to fully stabilize and maintain the test suite.
[1] https://eap-qe-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/artemis-project-testsuite-rhel-master/
[2] https://issues.jboss.org/browse/JBEAP-2574
- incorporates
-
ENTMQBR-1837 SimpleOpenWireTest.testTempQueueDelete is flaky in Artemis master
- Closed
-
ENTMQBR-1838 Integration test ClusteredMessageCounterTest#testNonDurableMessageAddedWithPaging is flaky in Artemis master
- Closed
-
ENTMQBR-1867 Integration test QueueControlTest#testGetFirstMessage sometimes fails with NPE
- Closed
-
ENTMQBR-1902 Intermittent AssertionError in integration test org.apache.activemq.artemis.tests.integration.cluster.failover.BackupSyncJournalTest#testReserveFileIdValuesOnBackup
- Closed
- relates to
-
JBEAP-2574 Stabilization of ActiveMQ Artemis upstream test suite
- Closed
-
ENTMQBR-1939 Make "broker jms unit" tests longer
- Closed