-
Bug
-
Resolution: Cannot Reproduce
-
Critical
-
jboss-fuse-6.3
-
None
-
%
-
Sprint 6 - towards CR1
This issue occurs randomly, from time to time, the containers that are joining the ensemble will get stuck in provision status != success state.
Mostly after creating a 3node ensemble, one container gets stuck in validating baseline information and two containers are successfully provisioned.
Now I got (no change after ~20 mins of waiting):
JBossFuse:admin@root> container-list [id] [version] [type] [connected] [profiles] [provision status] root* 1.0 karaf yes fabric success jboss-fuse-full fabric-ensemble-0001-1 test1 1.0 karaf yes default validating baseline information fabric-ensemble-0001-2 test2 1.0 karaf yes default installing fabric-ensemble-0001-3
I applied these steps:
container-create-child root test 2 ensemble-add --force test1 test2