Uploaded image for project: 'Red Hat Fuse'
  1. Red Hat Fuse
  2. ENTESB-4940

Backport SWITCHYARD-2796 to Fuse 6.2.1

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • jboss-fuse-6.2.1
    • jboss-fuse-6.2.1
    • SwitchYard
    • None

      https://issues.apache.org/jira/browse/CAMEL-8476 changed the fault handling logic in Camel if there is no out message.

      This requires the code change from SWITCHYARD-2796 for the fault to be propagated correctly on the Switchyard side.

              tcunning@redhat.com Thomas Cunningham
              rhn-support-mputz Martin Weiler (Inactive)
              Stefan Veres Stefan Veres (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: