-
Bug
-
Resolution: Done
-
Critical
-
jboss-fuse-6.2.1
-
%
-
-
-
Sprint 5 - towards ER2
Creating a child container on 6.2.1 can take a very long time if the profile to be applied to the child container references Maven artefacts that are not available locally. It takes about 5 mins for every remote bundle to be provisioned to the container. If there are multiple ( n ) bundles to be downloaded from remote repository, provisioning the child container takes n * 5 minutes.
- duplicates
-
ENTESB-5121 [6.3] Adding quickstart profile to child container takes about ~10 min to provision
- Closed
- relates to
-
ENTESB-5038 Child container on root cannot resolve artifact from fabric maven proxy.
- Closed
-
ENTESB-5717 Exception on creating ssh container (Could not find artifact)
- Closed
-
ENTESB-5478 Downloading of artifacts is frozen due to some file locks in local repository
- Closed
-
ENTESB-5512 [Fabric] some default pids in etc/ folder are not correctly deleted/overwritten at container creation time, according to profile definition
- Closed
-
ENTESB-5908 /hawtio java.lang.IllegalStateException: Committed
- Closed
-
ENTMQ-1758 Sometimes can't apply patch Rollup 2 to a fabric formed from A-MQ distribution
- Closed