Uploaded image for project: 'Red Hat Fuse'
  1. Red Hat Fuse
  2. ENTESB-3916

Multiple SwitchYard tests fail for a single RESTEasy endpoint

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • jboss-fuse-6.2.1
    • jboss-fuse-6.2, jboss-fuse-6.2.1
    • SwitchYard
    • None
    • % %
    • Hide

      A reproducer (switchyard-rest-test.zip) attached. Simply running mvn test shows you the problem.

      Show
      A reproducer (switchyard-rest-test.zip) attached. Simply running mvn test shows you the problem.

      Platform JIRA for SWITCHYARD-2787

      When there are multiple test methods for a single RESTEasy endpoint in a SY test class, some of them sporadically hang and eventually fail with a timeout error after a very long time (about 5 mins).
      This test issue seems to occur only with RESTEasy binding and not with other bindings.

            tcunning@redhat.com Thomas Cunningham
            rhn-support-tasato Tadayoshi Sato
            Tomas Turek Tomas Turek
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: