-
Task
-
Resolution: Done
-
Major
-
None
-
None
-
False
-
None
-
False
-
%
-
Todo
From Fuse 7.11.1, we have new pipelines and they need to be monitored that all the steps have been executed.
Pipelines to monitor:
*fis-
*fis-{version}
-xpaasqe-gui-dockerized* (for [gui] profile only)
¦
¦
*fis-
¦
¦
*fis-{version}
pipeline
* https://fuse-7x-jenkins-csb-fuse-qe.apps.ocp-c1.prod.psi.redhat.com/job/fis-{version}-xpaasqe-default-dockerized
* https://fuse-7x-jenkins-csb-fuse-qe.apps.ocp-c1.prod.psi.redhat.com/job/fis-{version}-xpaasqe-gui-dockerized
* https://fuse-7x-jenkins-csb-fuse-qe.apps.ocp-c1.prod.psi.redhat.com/job/fis-{version}-xpaasqe-orchestration-single-dockerized
* https://fuse-7x-jenkins-csb-fuse-qe.apps.ocp-c1.prod.psi.redhat.com/job/fis-{version}-pipeline-{spring_boot_version}
-dockerized
Polarion report:
-
- Search for related test plan in https://polarion.engineering.redhat.com/
DoD:
- evaluate test results based on the older test results (Jenkins/Polarion)
- report a JIRA issue if there are any failing tests
- see if there are any new failing tests compared to reported last time
How to run manually:
- Non-dockerized mode: https://docs.engineering.redhat.com/display/fuseqe/Fuse+on+Openshift+7.x+Testing
- Dockerized mode: https://gitlab.cee.redhat.com/mcarlett/containerized-xpaas-qe/-/blob/master/README.md
Plan B
- Use Code Ready Container in place of remote OCP 4.x instance, and run test manually as mentioned above