Uploaded image for project: 'Red Hat Fuse'
  1. Red Hat Fuse
  2. ENTESB-19600

Use camel-jbang for testing Kamelets

XMLWordPrintable

      Leverage YAKS tests but also POC the usage of camel-jbang which might be able to provide faster turnaround times when running Kamelet tests without a running Camel K infrastructure (e.g. Kind).

      We can use YAKS also in a local environment where the Kamelet under test is run via camel-jbang. This would save us some time to start and manage a Camel-K runtime infrastructure.

              Unassigned Unassigned
              christoph.deppisch Christoph Deppisch
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: