Uploaded image for project: 'Drools'
  1. Drools
  2. DROOLS-3120

[DMN Designer] Validation Error State remains active

XMLWordPrintable

    • Hide
      1. Create new DMN model
      2. Add Two Decision and one Business Knowledge Model
      3. Connect Decision Nodes with information requirement connector
      4. Try to move end point of the added connector over the Business Knowledge Model Nodes
      5. The Business Knowledge Model node is highlighted by red
      6. After connector move action is cancelled, the BKM node remain highlighted as red
      Show
      Create new DMN model Add Two Decision and one Business Knowledge Model Connect Decision Nodes with information requirement connector Try to move end point of the added connector over the Business Knowledge Model Nodes The Business Knowledge Model node is highlighted by red After connector move action is cancelled, the BKM node remain highlighted as red
    • NEW
    • NEW

      The is sequence of steps the error validation state of node remains active. It is shown in the attachment.

              manstis@redhat.com Michael Anstis
              rh-ee-jomarko Jozef Marko (Inactive)
              Jozef Marko Jozef Marko (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: