Uploaded image for project: 'Drools'
  1. Drools
  2. DROOLS-1101

Upgrade protobuf-java from 2.5.0 to 2.6.0

XMLWordPrintable

    • NEW
    • NEW

      From RPM discussion (BPMSPL-282)
      Productization: protobuf-java redhat version is: 2.6.0-redhat-1, is it ok to upgrade from 2.5.0->2.6.0?

      Motivation:

      • The 2.5 version isn't build from source by productization, there is no redhat version.
      • The 2.6 version is, which means they can do security patches on it easily (= important for long term support) and it can be RPM'ed (important for BPMSPL-282, which has PM support)
      • 2.6 is higher than 2.5, so in theory this is low-risk change.

      Needed on both master and 6.4.x.

              gdesmet@redhat.com Geoffrey De Smet (Inactive)
              gdesmet@redhat.com Geoffrey De Smet (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: