-
Bug
-
Resolution: Done
-
Major
-
2.3.1.Final, 2.4.0.Alpha1
-
None
-
False
-
None
-
False
-
-
When the connector has fallen behind and is attempting to catch-up using the maximum batch size, the connector should ignore the mining distance calculation logic if the upper boundary of the mining window is before the current_scn - distance.
- relates to
-
DBZ-6660 Introduce internal config option to control how close to CURRENT_SCN Oracle may mine.
- Closed
- links to
-
RHEA-2023:120698 Red Hat build of Debezium 2.3.4 release