-
Feature Request
-
Resolution: Done
-
Major
-
3.0.0.GA
-
None
-
False
-
False
-
From 3.0 onward, we could consider a way to include IBM Semeru JDK images in the CRW payload for Power and Z. Note that the Certified Edition only exists for JDK 11, with an Open Edition for JDK 8.
$➔ podman run -it --rm --entrypoint /bin/bash registry.connect.redhat.com/ibm/ibm-semeru-runtime-open-jdk-8-ubi-minimal -c "java -version" openjdk version "1.8.0_322" IBM Semeru Runtime Open Edition (build 1.8.0_322-b06) Eclipse OpenJ9 VM (build openj9-0.30.0, JRE 1.8.0 Linux amd64-64-Bit Compressed References 20220128_306 (JIT enabled, AOT enabled) OpenJ9 - 9dccbe076 OMR - dac962a28 JCL - c1d9a7af7c based on jdk8u322-b06)
$➔ podman run -it --rm --entrypoint /bin/bash registry.connect.redhat.com/ibm/ibm-semeru-runtime-certified-jdk-11-ubi-minimal -c "java -version" java version "11.0.13" 2021-10-19 IBM Semeru Runtime Certified Edition 11.0.13.0 (build 11.0.13+8) Eclipse OpenJ9 VM 11.0.13.0 (build openj9-0.29.0, JRE 11 Linux amd64-64-Bit Compressed References 20211022_206 (JIT enabled, AOT enabled) OpenJ9 - e1e72c497 OMR - 299b6a2d2 JCL - 43ed76284c based on jdk-11.0.13+8)