Uploaded image for project: 'Cost Management'
  1. Cost Management
  2. COST-1753

Upgrade/Downgrade migration testing

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Obsolete
    • Icon: Critical Critical
    • None
    • None
    • QE
    • None
    • False
    • False
    • Undefined

      With all the migration slowness/issues lately we really want to put some test automation round this.

      Testing thoughts

      • Ingest data set on the commit that the current version of production is running.
      • Run test (i.e. raw calc)
      • Do code upgrade with migration
      • Re-run API verification step from the previous raw calc test
      • Roll back commit
      • Re-run API verification step one last time

       

      Other thoughts:

       

      We could have a job running with bonfire to deploy, run, update, run, downgrade then run the tests one last time.

              Unassigned Unassigned
              rhn-support-lcouzens Luke Couzens
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: