-
Epic
-
Resolution: Unresolved
-
Normal
-
None
-
None
-
hco-debt-4.21
-
Quality / Stability / Reliability
-
77
-
-
Green
-
In Progress
-
57% To Do, 29% In Progress, 14% Done
-
dev-ready, doc-ready, po-ready, qe-ready, ux-ready
-
Goal
Set of technical debt user stories; not really new features.
User Stories
- As a HCO Developer, I Want to close past technical debt, so that I can work on new feature on a more robust base.
Non-Requirements
- No new features
Notes
- Technical debt only
Owners
Role Contact PM TBD Documentation Owner TBD Delivery Owner (See assignee) Quality Engineer (See QA contact)
Done Checklist
Who | What | Reference |
---|---|---|
DEV | Upstream code and tests merged | <link to meaningful PR or GitHub Issue> |
DEV | Upstream documentation merged | <link to meaningful PR or GitHub Issue> |
DEV | gap doc updated | <name sheet and cell> |
DEV | Upgrade consideration | <link to upgrade-related test or design doc> |
DEV | CEE/PX summary presentation | label epic with cee-training and add a <link to your support-facing preso> |
QE | Test plans in Polarion | <link or reference to Polarion> |
QE | Automated tests merged | <link or reference to automated tests> |
DOC | Downstream documentation merged | <link to meaningful PR> |
- clones
-
CNV-57937 HyperConverged Operator technical debt (4.20)
-
- Closed
-
1.
|
upstream roadmap issue |
|
New | |
Unassigned |
2.
|
upstream design |
|
New | |
Unassigned |
3.
|
upstream documentation |
|
New | |
Unassigned |
4.
|
upgrade consideration |
|
New | |
Unassigned |
5.
|
test plans in polarion |
|
New | |
Unassigned |
6.
|
automated tests |
|
New | |
Unassigned |
7.
|
downstream documentation merged |
|
New | |
Unassigned |
8.
|
CNV QE DevOps Requirement/Enablement |
|
New | |
Unassigned |
9.
|
Verify our bundles with OLM 1.0 |
|
New | |
Unassigned |