Uploaded image for project: 'OpenShift Virtualization'
  1. OpenShift Virtualization
  2. CNV-66673

[CNV V4.18.10 + upstream packages] Manual validation of WSFC Cluster Large Copy with periodic Failover

XMLWordPrintable

    • Product / Portfolio Work
    • 5
    • False
    • Hide

      None

      Show
      None
    • False
    • None
    • 5
    • CNV Storage 274, CNV Storage 275, CNV Storage 276, CNV Storage 277
    • None

      Verifying that a large copy operation continues uninterrupted with periodic multipath failovers.
      The time comparison between the happy path copy operation and the copy operation with a single multipath failover is similar.

        1. image-2025-08-12-21-54-41-727.png
          309 kB
          Kevin Alon Goldblatt
        2. journalctl-qemu-pr-helper
          0.0 kB
          Kevin Alon Goldblatt
        3. journalctl-multipathd
          3.62 MB
          Kevin Alon Goldblatt
        4. journalctl
          9.36 MB
          Kevin Alon Goldblatt
        5. multipath-switch.sh
          7 kB
          Kevin Alon Goldblatt

              kgoldbla Kevin Alon Goldblatt
              kgoldbla Kevin Alon Goldblatt
              Natalie Gavrielov Natalie Gavrielov
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: