Goal
The data centre where the current upstream CI workloads cluster resides is due for closure on March 4th 2025. A lift and shift migration is not possible as the IP spaces of the existing servers cannot be maintained. A new cluster will have to be built and the CI workloads migrated over to the new cluster
User Stories
- As a CI owner, I want to ensure that my CI jobs are migrated successfully over to a new cluster before the DC closure, so that there is no down time or impact experienced to the SIG teams and contributors
Notes
- Document outlining plan for workload migration - https://docs.google.com/document/d/14rT04xyqijuVnHJ4NgrihquFCRIgUZj3C7NmX2s-k0s/edit?tab=t.0#heading=h.671yhipuddh