-
Epic
-
Resolution: Unresolved
-
Major
-
None
-
None
-
cnv-descheduler-ui-settings
-
77
-
To Do
-
VIRTSTRAT-65 - Load Aware balancing
-
Goal
Create an an entry for the desceduler in the CNV Settings panel.
The settings should cover
1. Enabling the Descheduler, by creating a default descheduler CR
2. Selecting the profiles to run by the descheduler (drop down for LongRunning and the UtilizationAware profiles)
Reference for descheduler CR will be provided.
User Stories
- "As a cluster administrator, I want enable the descheduler and configure it, so that my workloads will be rebelanaced according to the select profile (utilzatoin and requests based)
- another user story
Non-Requirements
- List of things not included in this epic, to alleviate any doubt raised during the grooming process.
Notes
- Any additional details or decisions made/needed
- clones
-
CNV-4600 CNV Epic Template
-
- New
-
1.
|
upstream roadmap issue |
|
New | |
Unassigned |
2.
|
upstream design |
|
New | |
Unassigned |
3.
|
upstream documentation |
|
New | |
Unassigned |
4.
|
upgrade consideration |
|
New | |
Unassigned |
5.
|
CEE/PX summary presentation |
|
New | |
Unassigned |
6.
|
test plans in polarion |
|
New | |
Unassigned |
7.
|
automated tests |
|
New | |
Unassigned |
8.
|
downstream documentation merged |
|
New | |
Unassigned |