Uploaded image for project: 'OpenShift Builds'
  1. OpenShift Builds
  2. BUILD-826

Onboard Robo-badger service to Shipwright product

XMLWordPrintable

    • False
    • None
    • False
    • Pipeline Integrations #3253

      Story (Required)

      <Describes high level purpose and goal for this story. Answers the questions: Who is impacted, what is it and why do we need it? How does it improve the customer’s experience?>

      Software production Cloud Workflow Product Configuration team strongly advice product teams to configure the Robo badger automation which can significantly speed up any small changes in release configuration.
      Shipwright is already onboarded to Honeybadger automation but it is missing Robo-badger service.

      Background (Required)

      <Describes the context or background related to this story>

      Robo-badger is a GitLab bot that allows users to automatically merge some merge requests without a review from release engineers if the changes present in the MR meet the requirements.

      Out of scope

      <Defines what is not included in this story>

      NA

      Approach (Required){}

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Steps to set Robo-badger service are described here https://exd-guild-self-service.pages.redhat.com/hb-docs/user/robo-badger.html

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      • Robo-badger service is successfully set up for the Shipwright product.

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

       

              diagrawa Divyanshu Agrawal
              diagrawa Divyanshu Agrawal
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: