Uploaded image for project: 'AeroGear'
  1. AeroGear
  2. AEROGEAR-9953

As a Developer, I want the Push Operator to be consumable by the RHMI Operator.

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Done
    • Icon: Major Major
    • None
    • None
    • push
    • RHMI consume UPS Op
    • To Do

      This card comes from the RHMI Gating Process requirements doc.

      Trello link

      Acceptance Criteria

      1. CSV for Operator
      2. Add to RHMI OperatorSource
      3. Document permissions needed by Operator
      4. Ensure the ‘status’ field of the installation CR complies with the defined states expected by RHMI
      5. Requests and limits defined for memory and CPU for all pods (Operator and Service)

              gryan@redhat.com Gerard Ryan
              aliok@redhat.com Ali Ok
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: