Value Statement
As an ACM policy user, I need to ensure that compliance events are recorded in long-term storage even when the hub cluster is not reachable from the managed cluster at the time the compliance event is generated. This is required to guarantee accuracy.
Definition of Done for Engineering Story Owner (Checklist)
- Implement phase 2 as designed except for the persistent volume configuration. That will be done separately.
Development Complete
- The code is complete.
- Functionality is working.
- Any required downstream Docker file changes are made.
Tests Automated
- [ ] Unit/function tests have been automated and incorporated into the
build. - [ ] 100% automated unit/function test coverage for new or changed APIs.
Secure Design
- [ ] Security has been assessed and incorporated into your threat model.
Multidisciplinary Teams Readiness
- [ ] Create an informative documentation issue using the [Customer
Portal_doc_issue template](
https://github.com/stolostron/backlog/issues/new?assignees=&labels=squad%3Adoc&template=doc_issue.md&title=),
and ensure doc acceptance criteria is met. Link the development issue to
the doc issue. - [ ] Provide input to the QE team, and ensure QE acceptance criteria
(established between story owner and QE focal) are met.
Support Readiness
- [ ] The must-gather script has been updated.