-
Epic
-
Resolution: Done-Errata
-
Normal
-
ACM 2.9.0
-
Release a VolSync v0.8.0
-
False
-
None
-
False
-
Green
-
In Progress
-
0% To Do, 0% In Progress, 100% Done
OCP/Telco Definition of Done
<https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde>
Epic Template descriptions and documentation.
<https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit>
ACM-wide Product Requirements (Top-level Epics)
<https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit>
*<--- Cut-n-Paste the entire contents of this description into your new
Epic --->*
Epic Goal
Release the next version of VolSync (v0.8.0)
Why is this important?
We have upstream features which can be useful for customers - would like to release a v0.8.0 around the time of the ACM 2.9 release (or potentially even beforehand).
Scenarios
- Update mover dependencies:
- restic
- rclone
- syncthing
- Restic - specify a customCA in a configmap (https://issues.redhat.com/browse/RFE-4084)
- Restic - new feature to run a restic unlock (OADP is very interested in this)
- Volume Populator - allow a PVC to be created from a ReplicationDestination
Acceptance Criteria
...
Dependencies (internal and external)
- ...
Previous Work (Optional):
- ...
Open questions:
- …
Done Checklist
- CI - CI is running, tests are automated and merged.
- Release Enablement <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
Issue> - DEV - Upstream documentation merged: <link to meaningful PR or GitHub
Issue> - DEV - Downstream build attached to advisory: <link to errata>
- QE - Test plans in Polarion: <link or reference to Polarion>
- QE - Automated tests merged: <link or reference to automated tests>
- DOC - Downstream documentation merged: <link to meaningful PR>
- links to
-
RHEA-2023:121046 VolSync 0.8 for RHEL 8