Uploaded image for project: 'Red Hat Advanced Cluster Management'
  1. Red Hat Advanced Cluster Management
  2. ACM-27129

Implement history support in OCM.io discovered policies

XMLWordPrintable

    • Implement history support in OCM.io discovered policies
    • Product / Portfolio Work
    • 5
    • False
    • Hide

      None

      Show
      None
    • False
    • Green
    • In Progress
    • ACM-20896 - History support in OCM.io discovered policies (UI)
    • ACM-20896History support in OCM.io discovered policies (UI)
    • 0% To Do, 100% In Progress, 0% Done

      OCP/Telco Definition of Done
      https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
      Epic Template descriptions and documentation.
      https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
      ACM-wide Product Requirements (Top-level Epics)
      https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit

      *<--- Cut-n-Paste the entire contents of this description into your new
      Epic --->*

      Epic Goal

      • The UI MUST be updated to retrieve and display the last 10 compliance events by querying the policy template resources (e.g., ConfigurationPolicy, CertificatePolicy, OperatorPolicy status), which now contain the event data.
      • The existing policy history page MUST be moved and displayed as a new tab (e.g., "History" or "Event History") within the Policy details page.
      • The existing "View history" link on the Policy details > Results page MUST be updated to link directly to the new "History" tab. 
      • The new "History" tab MUST be available and correctly populated with event data for both policies deployed via the RHACM framework and policies deployed via alternative methods (Discovered Policies).
      • UI must gracefully handle cases where no history events are present.

      Why is this important?

      There's a feature gap between framework-deployed and externally deployed OCM.io policies

      Scenarios

      ...

      Acceptance Criteria

      ...

      Dependencies (internal and external)

      1. ...

      Previous Work (Optional):

      1. ...

      Open questions:

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Doc issue opened with a completed template. Separate doc issue
        opened for any deprecation, removal, or any current known
        issue/troubleshooting removal from the doc, if applicable.
      • Considerations were made for Extended Update Support (EUS)

              fxiang@redhat.com Feng Xiang
              fxiang@redhat.com Feng Xiang
              David Huynh David Huynh
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: