-
Story
-
Resolution: Unresolved
-
Major
-
None
*Value Statement*
As a Global Hub operator, I need to test Global Hub reliability under failure scenarios including power outages and network disconnections so that we can ensure the system recovers gracefully from these failures in production.
*Definition of Done for Engineering Story Owner (Checklist)*
- Power outage scenarios tested
- Network disconnection scenarios tested
- Recovery procedures validated
- Reliability test results documented
*Development Complete*
- [ ] The code is complete.
- [ ] Functionality is working.
- [ ] Any required downstream Docker file changes are made.
*Tests Automated*
- [ ] Unit/function tests have been automated and incorporated into the build.
- [ ] 100% automated unit/function test coverage for new or changed APIs.
*Secure Design*
- [ ] Security has been assessed and incorporated into your threat model.
*Multidisciplinary Teams Readiness*
- [ ] Create an informative documentation issue using the Customer Portal Doc template that you can access from [The Playbook](https://docs.google.com/document/d/1YTqpZRH54Bnn4WJ2nZmjaCoiRtqmrc2w6DdQxe_yLZ8/edit#heading=h.9fvyr2rdriby), and ensure doc acceptance criteria is met.
Call out this sentence as it's own action:
- [ ] Link the development issue to the doc issue.
*Support Readiness*
- [ ] The must-gather script has been updated.
—
*Description updated to follow ACM Story template. Generated with Claude Code - https://claude.com/claude-code*