Uploaded image for project: 'Red Hat Advanced Cluster Management'
  1. Red Hat Advanced Cluster Management
  2. ACM-26549

As a global hub user, I can rely on Global Hub to recover from power outages and network disruptions so that production environments remain resilient

XMLWordPrintable

    • Product / Portfolio Work
    • False
    • Hide

      None

      Show
      None
    • False
    • Not Selected
    • None

      *Value Statement*

      As a Global Hub operator, I need to test Global Hub reliability under failure scenarios including power outages and network disconnections so that we can ensure the system recovers gracefully from these failures in production.

      *Definition of Done for Engineering Story Owner (Checklist)*

      • Power outage scenarios tested
      • Network disconnection scenarios tested
      • Recovery procedures validated
      • Reliability test results documented

      *Development Complete*

      • [ ] The code is complete.
      • [ ] Functionality is working.
      • [ ] Any required downstream Docker file changes are made.

      *Tests Automated*

      • [ ] Unit/function tests have been automated and incorporated into the build.
      • [ ] 100% automated unit/function test coverage for new or changed APIs.

      *Secure Design*

      • [ ] Security has been assessed and incorporated into your threat model.

      *Multidisciplinary Teams Readiness*

      Call out this sentence as it's own action:

      • [ ] Link the development issue to the doc issue.

      *Support Readiness*

      • [ ] The must-gather script has been updated.


      *Description updated to follow ACM Story template. Generated with Claude Code - https://claude.com/claude-code*

              clyang82 Chunlin Yang
              clyang82 Chunlin Yang
              Yaheng Liu Yaheng Liu
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: