Uploaded image for project: 'Red Hat Advanced Cluster Management'
  1. Red Hat Advanced Cluster Management
  2. ACM-22996

Enhance ClusterCurator EUS upgrade to have an extra posthook after the intermediate upgrade

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Undefined Undefined
    • Future
    • None
    • Cluster Lifecycle
    • None
    • Enhance ClusterCurator EUS upgrade to have an extra posthook after the intermediate upgrade
    • Product / Portfolio Work
    • False
    • Hide

      None

      Show
      None
    • False
    • Not Selected
    • To Do

      OCP/Telco Definition of Done
      https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
      Epic Template descriptions and documentation.
      https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
      ACM-wide Product Requirements (Top-level Epics)
      https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit

      *<--- Cut-n-Paste the entire contents of this description into your new
      Epic --->*

      Epic Goal

      Allow the user to have an extra posthook after the intermediate upgrade finished and before the final upgrade starts.
      The container order would be like:

      • prehook-ansiblejob
      • intermediate-upgrade-cluster
      • intermediate-monitor-upgrade
      • intermediate-posthook-ansiblejob
      • final-upgrade-cluster
      • final-monitor-upgrade
      • posthook-ansiblejob

      This is mainly useful for for example:

      • Updating the channel
      • Checking deprecated APIs for next version
      • Ensure that the cluster is in shape to continue upgrade to final version
        Update Azure managed identity permissions (with ccoctl)

       

      Requested by Amadeus https://redhat-internal.slack.com/archives/C04EYRKRXGF/p1753358769936029?thread_ts=1711474370.934189&cid=C04EYRKRXGF

      Why is this important?

      See above.

      Scenarios

      ...

      Acceptance Criteria

      ...

      Dependencies (internal and external)

      1. ...

      Previous Work (Optional):

      1. ...

      Open questions:

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Doc issue opened with a completed template. Separate doc issue
        opened for any deprecation, removal, or any current known
        issue/troubleshooting removal from the doc, if applicable.
      • Considerations were made for Extended Update Support (EUS)

              fxiang@redhat.com Feng Xiang
              rh-ee-yajbar Younes Ajbar
              David Huynh David Huynh
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: