XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Major Major
    • ACM 2.15.0
    • None
    • GRC
    • None
    • Policy Tech Debt 2.15
    • Quality / Stability / Reliability
    • False
    • Hide

      None

      Show
      None
    • False
    • Not Selected
    • In Progress
    • 82% To Do, 4% In Progress, 14% Done

      OCP/Telco Definition of Done
      https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
      Epic Template descriptions and documentation.
      https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
      ACM-wide Product Requirements (Top-level Epics)
      https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit

      *<--- Cut-n-Paste the entire contents of this description into your new
      Epic --->*

      Epic Goal

      Burn down some remaining items from the 2.14 effort: https://issues.redhat.com/browse/ACM-21221 (items will be moved into the new epic).

      We should also spend time getting things organized in Konflux in order to reduce developer toil keeping pipelines up to date, and consider if running tests in Konflux would be beneficial.

      We have a very large number of tests. We should ensure there are not unnecessary duplicates, and that things are being tested at the right levels.

      Why is this important?

      ...

      Scenarios

      ...

      Acceptance Criteria

      ...

      Dependencies (internal and external)

      1. ...

      Previous Work (Optional):

      1. ...

      Open questions:

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Doc issue opened with a completed template. Separate doc issue
        opened for any deprecation, removal, or any current known
        issue/troubleshooting removal from the doc, if applicable.
      • Considerations were made for Extended Update Support (EUS)

              Unassigned Unassigned
              jkulikau@redhat.com Justin Kulikauskas
              Derek Ho Derek Ho
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: